Projects

Contract Ref

Description

Client

Period

824-106 Lot-II
Supply of aluminium alloy tubing & hardwareWAPDA05-06-1995
566-17B
Supply of conductor & shieldwire accessories
WAPDA
30-02-1995
WB-ESL-926 (Lot-III & IV)
Supply of transmission line hardware & vibration samplesWAPDA
08-11-1995
1150-8
Design, manufacture, supply, erection, testing & commissioning of OPGW
WAPDA
20-01-1995
PUR 5-3/92/993
Digital optical fibre transmission system
PTC10-06-1995
417 Lot-II
Supply of hardware
WAPDA
15-11-1995
609 Lot-XI
Supply of earthing material
WAPDA
14-05-1995
527 Lot-V
Supply of 132KV Hardware
WAPDA
19-04-1995
 
Supply of Aluminum alloy tubing, hardware & substation connectors
WAPDA
1996
 
Supply of 132kV transmission line hardware
WAPDA1996
 Supply of transmission line hardwareWAPDA1997
 Supply of transmission line hardwareWAPDA1997-1998
 Supply of conductor & shieldwire accessories & dampers for 500kV transmission line
 
WAPDA1997-1998
 Supply of conductor & shieldwire accessories & dampers for 500kV transmission line
 
WAPDA1998
524(Lot-II)
Supply of metering system for grids
WAPDA15-03-2000
 
500kV Transmission line Supply of transmission line conductor & hardware
WAPDA2000
11-20 Lot-2
Supply of transmission line conductor & hardware
WAPDA2001
824-111(A)
Transmission line hardwareWAPDA2001
1150-3 (Item-3)
Supply of transmission line hardwareWAPDA2001
ADB 11-04 Lot-3
Supply of transmission line hardwareWAPDA2001
GSQ-3 Lot-IX
Supply of aluminium alloy tubing & hardware
WAPDA2002
824-106 Lot-III
Supply of substation connectorsWAPDA2002
CFE-01 (P)
Precision Metering Systems for Imp & Exp of Electricity.
WAPDA1998-2000
KF-536.A
Supply of Stock Bridge Switzerland vibration dampers
WAPDA2000
LESCO-218/98
Supply of KVRH, KWH-MDI Meters
WAPDA1998
2719-22/CE/RDIC/99-2000
Supply of KWH-MDI MetersPESCO1999-2000
513/OP/ITR/10(749)/18
Supply of spares for Ingersoll-Rand air compressorsWAPDA2001
2017-3
Supply of dampers for In and out arrangement of Tarbela-Gatti 500 Kv circuit 1&2 BarothaWAPDA2003
AO0106
Supply of LT CT Operated Static Trivector Energy Meters
KESC2003
IBRD-527 Lot-V
Supply of connectorsWAPDA2003
IBRD-527 Lot-V
Variation orderWAPDA2003
DGSW/721/2004
Supply of Power Line Filters
Allied Engineering RWP06-04-2004
DGSW/720/2004
Supply of Gen SetsAllied Engineering RWP06-04-2004
ECS/FIJW/ELECT
/01/2004
Supply of Gen SetsEngineering Consultancy Islamabad18-11-2004
 Supply of earthing materialEngineering Consultancy Islamabad22-02-2005
PPW//2005
Supply of earthing materialPowerplant Workshop Islamabad2005
ECS/FIJW/ELECT/2005
Supply of earthing materialEngineering Consultancy Islamabad2005
2005-06
Supply of RF Doors
Allied Engineering RWP2005-2006
DGSW/2006
Supply of power line filtersAllied Engineering RWP2006
SIEMENS/PO
Supply of post insulators
Siemens Pakistan2005
ADP-66/06
Supply of metering systemWAPDA2006
CMEC/PO
Supply of earthing materialCMEC/ WAPDA2006
SEPC/PO
Supply of post insulatorsSEPC2006
500KV Sahiwal S/S Project 2005Supply of control cablesWAPDA2005
500KV Gakhar S/S Project 2007
Supply of control cablesWAPDA/Siemens2007
CMEC/PO for MG-1/Pack-1
Supply of S/S hardwareCMEC/ WAPDA2007
WAPDA/500KV KESC02
Supply of control cablesWAPDA/ Siemens2006
LSECO/WAPDA
Project 2007
Supply of meter testing equipmentLESCO/ WAPDA2007
KESC/721/07
Supply of metering systemKESC2007
GEPCO/PO/STG-02
Supply of control cablesGEPCO/ WAPDA2007
2007Supply of AVRsGEPCO/ WAPDA2007
2007/AESupply of AVRsAllied Engineering RWP2007
Pakistan PWD
Supply of AVRsP.W.D2007
IST/SW/2007
HFSS SoftwareInstitute of Space Technology2007
IST/SW/2008HFSS SoftwareIST Karachi2008
IST/09
TICRA
IST2009
WAPDA/NTDC
220 kV Dadu Khuzdar
ICC2009

Telecom Projects

Sr#

Description

Client

Period

1.Supply Installation & Commissioning of MB/S Optical Fiber EquipmentPakistan Telecommunication Authority1995-1996
2.Supply Installation, Testing and Commissioning of PLC for Ghazi Brotha Hydro Project
Water & Power Development Authority
1995-1996
3.Supply Installation & Commissioning of OPGW Cables & Repeaters for 500KV T/L Muzaafargarh-DaduWater & Power Development Authority
1996-1997
4.
Supply Installation of AVRs
Director General Immigration and Pass Islamabad
2006-2007
5.
Supply Installation of UPS
Director General Immigration and Pass Islamabad2007-2008